Online Reservation
Customer Care Hotline:
86-86773
 
For students and young urban professionals in Manila seeking for a new independent life, Torre Central is a high-rise condominium designed to provide utmost convenience and a secure place of living to its unit owners.

With units ranging from 16.55 to 37 sq.m , each Torre Central unit aims to provide a living space that is conducive for learning and manageable. Amenities of Torre Central includes swimming pool, study lounge, gym and a half-court basketball court that matches the lifestyle of the unit owners.

LTS: 29206
Visit www.torrecentral.com.ph
Amenities

Promoting a balanced lifestyle, Torre Central extends cultivating and modern amenities, whether for work or leisure—with a study hall, gym, swimming pool, basketball court, and a deck lounge. Whether its for the poised, sophisticated professional or the vivacious, optimistic student, there's a lot of room and reason for an inspired lifestyle in Torre Central.

543_0012_torre-central-amenities-3 543_0017_torre-central-amenities-4 543_0035_torre-central-amenities 543_0018_torre-central-amenities-2
Unit Inclusions

Youthful. Stylish. Cultivating. Torre Central units embrace collegiate and professional living with space-saving details for storage solutions, study area, and dining and kitchen nook. Furnished studio havens await aspiring students and yuppies for their daily life endeavors. Floor plans are designed to maximize space to house different resident types.

543_0025_torre-central-unit-3 543_0026_torre-central-unit-2 543_0032_torre-central-unit aaaa z_resize aaaa
Floor Plans

Location

Strategically located near universities, hospitals, churches and commercial areas.

  • Univeristy of Santo Tomas
  • UST Hospital
  • Far Eastern University
  • SM San Lazaro
Information Office

1372 Brickly 1 Espana St. Cor. Centro St. Sampaloc Manila

  • September Updates 2017
    September Updates 2017
  • August Updates 2017
    August Updates 2017
  • July Updates 2017
    July Updates 2017
  • February Updates 2017
    February Updates 2017
  • November Updates 2016
    November Updates 2016
  • October Updates 2016
    October Updates 2016
  • Construction Update Sept. 2016
    Construction Update Sept. 2016
  • Construction Update Aug 2016
    Construction Update Aug 2016
Let's Talk
  
© 2017 Torre Lorenzo. All Rights Reserved. Website Designed and Developed by WCube Solutions